Remove, rebuild and reinstall two fire protection pumps, including replacement of associated check valves located along pier within B-119 at Navy Fuel Depot. Additional work included cleaning and scraping of wetwell walls; and removal, cleaning and repair of filter gates. Crane Lift was coordinated for...

This project consisted of design and construction services associated with the facilitization (fit-out) of Building 1C to accommodate STARlite workload at the Tobyhanna Army Depot. ...

Barber Klein designed, permitted, and performed road improvements to Mustin Road at NAS Jacksonville. Improvements included widening the roadway, adding a center turn lane and storm water improvements. Barber Klein replaced the existing signalization mast arms, poles and bases at the intersection of Mustin Road...

Barber Klein performed the design of an approximately 900 foot steel sheet pile bulkhead with a concrete cap for a new marine facility and associated clubhouse. The bulkhead exposures were approximately 12 feet. The BKE contract included site inspections and certification of construction completion. ...