Replacement of Oily Waste Pipe – Echo Wharf 3 – NS Mayport

Category
Construction
About This Project

Replacement of approximately 120 feet of 8-inch oily waste pipeline under Echo 3 pier trench covers. All liquids remaining inside the pipes were drained and collected for disposal prior to salvage of the transfer line. Any sludges or solids remaining were collected and disposed through the NAVSTA Mayport Hazardous Waste Support Facility. Strict compliance with USL&H guidelines were followed due to the location of the pipeline along the wharf.