28 Jun Mayport Wharf Repairs
The project included adding new upper and lower padeyes, new fenders and fender jewelry to repair Mayport Wharfs Alpha, Charlie, Delta, Echo, Foxtrot and South Wall. ...
The project included adding new upper and lower padeyes, new fenders and fender jewelry to repair Mayport Wharfs Alpha, Charlie, Delta, Echo, Foxtrot and South Wall. ...
Barber Klein repaired and waterproofed the exterior of Building at Naval Station Mayport. Repair included sealing and glazing of over 300 windows. ...
The project consisted of upgrades to the central monitoring Steam Plant boiler controls system at Naval Air Station Jacksonville. ...
The project included repairs to the elevated water storage tank at US Army Garrison Carlisle Barracks. Repairs were made to the existing water tank foundation, exterior and interior tank repairs. ...
Miscellaneous Civil Works Design and other Architect-Engineer Services This IDIQ contract entails task orders that consist of environmental restoration, flood control, beach re-nourishment, erosion control, jetties, navigation, bridges, site planning, structural design (including pump stations, bridges, and water control structures), paving, grading, canals, levees, dams, drainage...
The project included repair and replacement of missing and broken jewelry and fenders at multiple Piers onboard Naval Station Mayport. ...
The project consisted of replacing approximately 120 feet of 8” oily waste pipeline at NS Mayport. ...
The HVAC system, more specifically the duct work for Bldg. 583 was not adequately insulated for the environment in which it is installed. Metal diffusers within the kennel area allowed for rapid condensation build up as the cool metal came in contact with the hot...
Barber Klein provided improvements to the existing storm drain system by replacing three drainage swales with concrete pipe and mitered end-sections where the drainage pipes discharge into the St. Johns River. Disturbed areas were then leveled and seeded for future use as military training/ceremony areas. ...
Abrasive blasting and repainting of the interior of the GSE Maintenance Shop, approximately 24,000 square feet with 30-foot high walls. The facility is used extensively to maintain the operational readiness of assets processed for redeployment to government fleets, and was subjected to the corrosive environment...