Barber Klein performed the construction of the new artificial reef near downtown. This project consisted of placing concrete material in a specified location near the Fuller Warren bridge downtown in an effort to promote marine life in the river, which will aid in improving water...

Demolition of deteriorating steel-frame canopy, structural design and construction new canopy. Structure is located directly on the flight line at Naval Station Mayport. All construction activities took place while the flight line was in use. This job required extensive safety plans and quality control due...

Enlargement and resurfacing of the Longshoreman’s Parking Lot on-board MCSF-BI. Barber Klein coordinated tests to determine soil classification, subgrade stabilization, compaction, asphalt mix and proper cross slope to provide adequate drainage for the newly paved parking surface. All specifications were in accordance with Florida Department...