Barber Klein performed the construction of the new artificial reef near downtown. This project consisted of placing concrete material in a specified location near the Fuller Warren bridge downtown in an effort to promote marine life in the river, which will aid in improving water...

The Florida Department of Environmental Protection’s John U. Lloyd Beach State Park had four (4) boardwalks adjacent to the ocean that were in need of replacement. This project involved the structural analysis and detailing for the replacement of the boardwalks while concurrently upgrading them for...

Demolition of deteriorating steel-frame canopy, structural design and construction new canopy. Structure is located directly on the flight line at Naval Station Mayport. All construction activities took place while the flight line was in use. This job required extensive safety plans and quality control due...

Enlargement and resurfacing of the Longshoreman’s Parking Lot on-board MCSF-BI. Barber Klein coordinated tests to determine soil classification, subgrade stabilization, compaction, asphalt mix and proper cross slope to provide adequate drainage for the newly paved parking surface. All specifications were in accordance with Florida Department...

Naval Station Mayport, FL Renovations to the Bath House included interior and exterior painting, tuck pointing of the existing masonry walls, demolition of existing lockers and bathroom stalls and the installation of new sinks, toilets, floor coating, partitions, accessories and fixtures. Design uplift calculations were performed...

FANG Building 1012 Re-Roof and Interior Finish with Fire Suppression Upgrade Design and construction of new interior walls; bathroom installation; removal and installation of new windows, flooring, doors, acoustical ceilings and grid; replacement of high-efficiency lighting and HVAC duct; and electrical distribution and panel upgrades. BKE...